THE SYSTEM

What we installed

10.45 kW existing solarRetained, not replaced
32 kWh SIGENERGY batteryWhole-home storage, retrofitted
10 kW SIGENERGY inverterSingle-phase hybrid, app-monitored
12 kW SIGENERGY GatewaySingle-phase whole-system management
12 kW DC EV chargerInstalled ready for a future EV
Earthing and DC cabling upgradeBrought to battery-integration standard

Kept the solar, upgraded everything around it

The Molendinar homeowners came to Evolved Solar wanting battery storage, not a new solar system. The 10.45 kW array on the roof was doing its job — so after an on-site assessment we designed around keeping it.

Our crew replaced the earthing system and the DC cable run to the panels, bringing the installation up to current standards for battery integration, then commissioned a 32 kWh hybrid battery with a 10 kW inverter and 12 kW Gateway. A 12 kW DC EV charger went in at the same time, ready for whenever an electric vehicle arrives.

Bringing an existing array up to standard for a battery is electrical work, not panel work — the same licensed trade behind our switchboard upgrades. Every install is handled by our own licensed electricians, no subcontractors, and signed off to Australian Standards.

THE PROJECT

Evolved Solar installer working on the existing rooftop solar array at a Molendinar home

THE RESULT

Storage without starting over

Before the retrofit, everything the 10.45 kW array produced went into the house as it was generated or straight out to the grid. Now the surplus goes into 32 kWh of storage and comes back out in the evening, when the household is home and actually using it.

The earthing and DC cabling work also means the original array is properly compliant for battery integration — so the system can be expanded again later without revisiting the same electrical work. The 12 kW DC charger is already in place for whenever an electric vehicle arrives.

If you're weighing up whether your existing solar can take a battery, our guide to solar batteries on the Gold Coast covers what to check first.

32 kWhStorage added
10.45 kWExisting solar retained
12 kWEV charging capacity
0Solar panels replaced
SAA-accredited installer Master Electrician Tier-1 products $20M installer insurance 10+ years experience

GALLERY

Photos from the Moledinar install

RELATED SERVICES

Explore what else we do

AREA SERVED

Proudly serving Molendinar and beyond

Proudly serving Molendinar and the Gold Coast, Logan and South-East Queensland. Local, licensed and accredited — with fast response times right across the region.

 

Ready to start your project?

Free, no-obligation quotes across Currumbin Waters and South-East Queensland.

1300 153 011

Previous
Previous

Loganholme – Solar, battery and switchboard upgrade

Next
Next

Mudgeeraba - Three Phase Solar & Battery